Booking a visitOnce you have contacted us, we will arrange to visit the property to measure up for the quotation, This will be sent to you alongside our pointing specification the same day. We do provide a rough estimate for scaffolding, though this will be handled by a third-party here on in.
|
CONSISTENT GRINDING DEPTHWe carefully grind out brickwork to the same depth as the height of the bed and deeper if necessary, leaving a square-cut joint. Where required we will thoroughly dampen with a hosepipe, before placing the mortar to reduce suction that may cause excessive shrinking.
|
FLUSH JOINTWe then hand-point the brickwork using a a dense mortar consisting of suited sharp sand, Natural Hydraulic Lime and a binder (usually 0-6mm limestone or 0-3mm granite). All works will be protected during bad weather if necessary and all waste will be removed from site upon completion.
|